QA to QC Training

REIP Inspections
Installed systems must pass an REIP inspection, conducted by the REIP Inspector, prior to local code inspection and issuance of an upfront incentive payment and SREC processing.  If a system deficiency is found, the installer must correct the problem and is request a REIP re-inspection.  The goals of the REIP inspections are to:

  • Ensure best design and instllation practices are followed
  • Ensure systems meet the minimum requirements of the REIP
  • Verify consistency of installed systems with specifications provided to the REIP via upfront incentive application forms

Transition from Quality Control to Quality Assurance Process
Currently, 100% of systems installed through the REIP are inspected in a Quality Control (QC) process.  The REIP Inspection protocols will transition from the QC Program to a Quality Assurance (QA)  Program, where a random sample of projects will be inspected, at ratios between 15% and 100%, depending on the type of project and the installer's inspection history.

See the Program Guidebook for additional information.

Required Training
Renewable energy contractors must complete the REIP Trade Ally QA to QC Training in order to participate in the Quality Assurance Process.  Training is provided in Iselin, New Jersey and registration is required.